Who needs to know, when installing an Air Source Heat Pump?
• Distribution Network Operator (DNO) (Electrical Supplier)
• Planning permission is not usually required but the unit must be positioned so as not to affect the appearance of the building
• Microgeneration Certification Scheme (MCS) possible grant funding
• Registered via Benchmark